Production

The production facilities of 1AK-PLASTIC are designed for the manufacturing of plastic components for batteries and are focused on stable serial production with high repeatability of product parameters.

The plant is equipped with injection molding machines with clamping forces ranging from 250 to 800 tons, integrated into a single technological complex with automated raw material feeding and cooling systems. The equipment is adapted for the production of monoblocks, covers, handles, pads and plug block elements for starter batteries of passenger and commercial vehicle groups in DIN and JIS standards.

The designed production capacity reaches up to 3 million sets per year.

The production process is built with a high level of automation and includes:

  • robotic installation of embedded elements into molds;
  • automatic removal and transfer of finished products;
  • centralized automated raw material feeding system;
  • continuous parameter monitoring at key stages of production.

This production setup ensures consistent product quality, precise geometry of components and efficient use of materials in serial manufacturing.


Plastic Components for Battery Manufacturing
Представители ТОП-менеджмента предприятий СЭЗ
Representatives of the top management of enterprises of the FEZ "Brest" at Battery Alliance LLC
Визит государственно-общественной группы на ООО
Visit of the state-public group to Battery Alliance LLC
Посещение аккумуляторного завода ООО
A member of the public visits the Battery Factory Battery Alliance LLC
ООО
Battery Alliance LLC
Сборочная линия LaPneumatica
Assembly line LaPneumatica
ООО
Battery Alliance LLC
ООО
Battery Alliance LLC
Благоустройсто территории завода ООО
Improvement of the territory of plant Battery Alliance LLC , August 2018
Разгрузка оборудования для завода ООО
Unloading of equipment for the plant Battery Alliance LLC, August 2018
Отделка фасада аккумуляторного завода ООО
Decoration of the facade of the battery plant Battery Alliance LLC, August 2018
Забивка пробных свай. 29.08.2017
29.08.2017
Поставка на объект первой партии свай. 03.11.2017
03.11.2017
Снятие и вывоз плодородного слоя
Removal of the fertile soil layer
Материалы для обустройства стройгородка и временное ограждение
Materials for the construction site and temporary fencing
01.02.2018
01.02.2018
01.02.2018
01.02.2018
27.03.2018
27.03.2018
27.03.2018
27.03.2018
11.04.2018
11.04.2018
11.04.2018
11.04.2018
11.04.2018
11.04.2018
Работы по благоустройству территории завода ООО
Works on improvement of the territory of Battery Alliance LLC, 30.05.2018
Работы по устройству фундаментов под технологическое оборудование, 30.05.2018
Work on the Foundation for technological equipment, 30.05.2018
Представители ТОП-менеджмента предприятий СЭЗ
Визит государственно-общественной группы на ООО
Посещение аккумуляторного завода ООО
ООО
Сборочная линия LaPneumatica
ООО
ООО
Благоустройсто территории завода ООО
Разгрузка оборудования для завода ООО
Отделка фасада аккумуляторного завода ООО
Забивка пробных свай. 29.08.2017
Поставка на объект первой партии свай. 03.11.2017
Снятие и вывоз плодородного слоя
Материалы для обустройства стройгородка и временное ограждение
01.02.2018
01.02.2018
27.03.2018
27.03.2018
11.04.2018
11.04.2018
11.04.2018
Работы по благоустройству территории завода ООО
Работы по устройству фундаментов под технологическое оборудование, 30.05.2018