IPower LLC informs about the next stage of construction. At the moment, in the administrative building is the installation of the furniture delivered to all Executive documentation, and submitted applications for obtaining certificates of compliance with technical conditions.
In the industrial building at an advanced stage of construction and installation works. Fully implemented installation of ventilation system and technological hoods, to the end of the suitable work on the device fire alarm, connection of cabinets. There are works on connection of the access control system. The system is designed to prevent unauthorized access to the plant, and time of arrival and departure of employees. The system works with a special chip cards and electronic locks installed on the doors of the enterprise.
The process of installation of the equipment. Already mounted the Assembly and finishing line LaPneumatica (Italy), in a short time, IPower LLC to produce supervision, will be attended by the representatives of the Italian company. Also mounted steel expanded line of Ateliers Roche (France), the French partners will also visit the enterprise. In addition, IPower LLC, after installation of equipment is planned the visit of representatives of companies-producers for commissioning of technological lines, as well as the release and testing of an experimental batch of products.
Installation of suction (gas-cleaning) plants Ekofiltr LLC (Russia, St. Petersburg).
Installation of bath units that are designed for cooling of the battery in the process of forming the charge.
Photo 1 - Installation of baths of formation
The plant also will be located pproizvodstvennye of the laboratory total area of more than 200m2. All construction and installation work at the site is completed. The laboratory at LLC", IPower" is intended for the certification of quality of materials entering the facility, finished products and monitoring at intermediate stages. The tasks are guaranteed high-tech equipment that made both domestic and foreign producers (Russia, Germany, Sweden, Italy). Laboratory equipment are fully arrived at the site, you are installing.
Photo 2 - Production laboratory
To date, great work has been done on writing instruction manuals and other technical documentation used in the manufacture of batteries. Work in this direction continues.
The project is implemented in accordance with the planned terms of implementation of technical supervision of supervision and control by the Inspectorate of the Department of control and supervision over the construction of the Brest region.
If you have any questions about the construction of OOO "IPower" can be accessed on an open line that is designed specifically to respond to all public interest issues. The open line is available on the corporate website www.1ak-group. com.
Photo 3 - Rooms ABK
Photo 4 - The Office
Photo 5 - Line finishing operations
Photo 6 - steel Expanded Linia